Windows, Insulation, Roof – Wasa Lake Renovation

The job is right on schedule and all inspections approved. The windows are beautiful letting in so much light. The side addition is connected to house, and the front part of the addition as well. The roof is on and everything is weather tight and ready for drywall. Insulation inspection passed yesterday. Electrical inspections passed and things are really starting to take shape.

The best part is our clients are happy and excited. Barnabas has even saved the day when water lines froze in the guest shack – unfortunately some “sketchy” workmanship took place out there that will have to be addressed.

Please look at progress since my last post:

Front Addition Framed and View Side Addition
photo 2 (5)

Front Addition and View From Side Addition

Structural Requirements – Beam Install
Beam Install

photo 3 (5)

Beam

Windows and Doors
Front Windows and Doors Wasa

photo 3 (5)

Windows

Insulation and Vapour Barrier
photo 2 (5)

photo 3 (5)

photo 4 (4)

For a view of all pictures in one of project progress to date please click here:
https://barnabasthebuilder.wordpress.com/photos/wasa-lake-cabin-renovation-and-addition/

Please note Barnabas will be relocating to Kelowna, BC in the Spring on 2014 – we will be servicing select out-of-town projects based on suitability.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s